How do I write a construction contract that actually protects me?

Most construction lawsuits are in the contract before the project starts. Harvey Stern has written them as the contractor and litigated them as the lawyer. Here is what a contract needs to say.

Short answer

A protective California construction contract defines the scope by reference to signed plans and specifications, states a fixed price or a clear cost-plus formula, ties every progress payment to completed work, requires written and signed change orders before changed work begins, sets start and completion dates with consequences, requires lien releases with each payment, specifies insurance, and for home improvement projects complies with Business and Professions Code section 7159, including the cap on down payments of $1,000 or 10 percent of the price, whichever is less.

Start with the scope

"Remodel kitchen and two baths" is not a scope. A scope is the plans and specifications, dated and signed, with the finish schedule, the allowances and the exclusions attached. If the contractor is bidding from plans, those plans are the contract. If there are no plans, write a detailed scope of work before you sign anything, room by room, with the materials and fixtures named. Every dispute Harvey has litigated over "that was included" or "that was extra" came from a contract with a vague scope.

Price and payment

A fixed price is simplest. A cost-plus contract (cost of the work plus a percentage or fee) is common for custom homes, and if you use one, require a guaranteed maximum price, define "cost" precisely, and require open books. Either way, the payment schedule must tie each payment to work actually completed, not to calendar dates. California's home improvement contract law, Business and Professions Code section 7159, makes that mandatory for residential projects: the down payment cannot exceed $1,000 or 10 percent of the price, whichever is less, and progress payments cannot exceed the value of work performed or materials delivered. Retention of 5 to 10 percent until final completion and punch list is customary and worth negotiating.

Change orders

The contract should say that no change to the scope, price or schedule is effective unless it is in writing, priced, and signed by both parties before the changed work begins. Then follow the rule. The change order article explains why this is where budgets fail.

Schedule

State a start date and a substantial completion date. Define substantial completion. Provide for excusable delays (weather, owner changes, permit delays) and for consequences if the contractor falls behind without excuse, whether that is a per-day liquidated damages amount or simply a right to terminate. A schedule without consequences is a wish.

Lien releases, insurance and licensing

Require a conditional lien release from the contractor and every subcontractor and supplier with each progress payment, and an unconditional release once the check clears (Civil Code sections 8132 to 8138). This is your protection against paying twice if the contractor does not pay a sub. Require certificates of general liability and workers' compensation insurance naming you as additional insured, and verify the contractor's license on the CSLB website before signing and before each payment. An unlicensed contractor cannot enforce the contract and must return what you paid (Business and Professions Code section 7031).

Permits, warranty, termination and disputes

Say who pulls the permits (it should be the contractor, under the contractor's license). Include a warranty of workmanship, typically one year, in addition to the statutory rights you cannot waive. Include a termination clause that lets you end the contract for abandonment or persistent breach after notice and a short cure period, with an accounting. Decide how disputes will be resolved: mediation first, then either court or arbitration, with attorney's fees to the prevailing party. Harvey generally recommends court as the backstop for residential projects; see the construction contracts page for why.

The section 7159 checklist

For a home improvement contract in California, the statute also requires: the contractor's name, address and license number; the approximate start and completion dates; a description of the work and materials; the contract price; a schedule of progress payments; the notice about mechanics liens; a checkbox for whether the contractor carries commercial general liability insurance; the three-business-day right to cancel (five days for owners 65 and older); and specific font and formatting requirements. A contract that omits these is a licensing violation by the contractor, and that violation is useful evidence if the project goes wrong.

Related questions

Can I use the contractor's standard form contract?

You can, but read it as a document written to protect the contractor, because it is. Have it reviewed before signing. A review takes a few days and costs a small fraction of what a scope dispute costs later.

Is a verbal construction agreement enforceable in California?

An oral agreement can be enforceable in theory, but a home improvement contract over $500 must be in writing under Business and Professions Code section 7159, and an oral agreement leaves every term open to dispute. Never proceed on a handshake.

Should the contract include liquidated damages for delay?

For a project where the completion date really matters (a rental, a move-in deadline), a reasonable per-day amount can be enforceable and is a useful incentive. The amount must be a reasonable estimate of actual harm, not a penalty, or a court will not enforce it.

This article is general information about California law, not legal advice for your situation. Facts matter; deadlines run. For advice on your own matter, request a free consultation.